A 250MW solar farm between Northwest and Monash in Australia caused power fluctuation to the bulk power grid. This project proposed an additional energy storage system, which was modeled in PSCAD. A power plant controller (PPC) per WECC compliance was designed and tuned for the hybrid energy system to damp the oscillation.
- August 8, 2023
- admin